New inspection cover

Inspection cover before and after

This jobs was for a new customer in Gunnislake. She needed an inspection cover in her drive and had been trying for a long time to find someone to do the work.

Having given a price for the work, we collected a new inspection cover from our suppliers and carried out the work in one visit.

The chamber was very deep (around 2 metres) so we temporarily fitted a piece of plywood in the hole to stop rubble from falling down and blocking the pipes. The old cover was removed and the height of the blockwork reduced slightly as it was too high in relation to the driveway. We then altered the opening as it was previously built too big and this was why the previous cover had failed as it was only supported one side. All the rubble was bagged up and any dust cleaned out of the chamber.

The new inspection cover was then cemented into position, the chippings replaced and the drive swept up.

The customer was pleased to get the job done and with the standard of work.